Teralba Pty Ltd Construction of Engineered Footing for Mixer Tank inside an existing Factory Works included: Cut existing slab, remove and then dig footing to 1200mm deep Removal of all…
Intrim Group Pty Ltd Construction of area for new Dust Extraction Unit. Works included: Construction of Concrete Footings and slab Adbri Block retaining wall to 3 sides Construction of driveway…