Construction of Engineered Footing for Mixer Tank inside an existing Factory
Works included:
- Cut existing slab, remove and then dig footing to 1200mm deep
- Removal of all waste off site
- Drill 600mm piers up to 3500mm deep
- Form and pour sides and base of footing working with engineered drawings
- Integrate load plates and form & pour top slab ready for Tank installation